Member You
#1 in Business Subscribe Email Print

You are here: Home > News and Society > Economics > Why We Need A Replacement Rail Tunnel At The Detroit-Windsor Crossing

Tags

  • logistics
  • mtunnel
  • future jobsinternal
  • county executive
  • handle todays

  • Links

  • How to Be Noticed and Influence Business
  • How To Make the Most of Stencils
  • Wireless Video Camera Technology Explained
  • Member You - Why We Need A Replacement Rail Tunnel At The Detroit-Windsor Crossing

    Do You Want To Be A Newbie Forever?
    So, do you want to be a newbie forever? Or do you want to make some money online?So much of the Internet is about Information. Every single day people search for quality information on every topic under the sun.If you want to be a provider of information and perhaps make a living at it, do you really need to buy one more eBook that claims it will reveal a SECRET about Inter
    pth

    49.2 ft. (15 m)

    Minimum Cover – River

    18 ft. (5.5 m)

    Minimum Cover – Land

    13.1 ft. (4 m)

    Operating Speed

    50 mph (80 kph)

    5. Replacement Rail Tunnel Specs

    It will be the first transportation infrastructure in over 75 years at this border crossing

    6. The DRTP has completed engineering to ensure the viability of this project

    7. Some of the support the replacement rail tunnel includes: MDOT, Detroit Renaissance, the Detroit Regional Chamber, Wayne County Executive Robert Ficano, Senator Debbie Stabenow, Teamsters President

    What is the Deal with Google Cash
    Google Cash - is an 87 page ebook by Chris Carpenter. It can help you transform your life by utilizing the power of Google's distribution network for your own personal profit. You don't need to be an online expert. PLUS You don't need to have lots of money to start. You can begin with $10 and 2 hours/week of work. You can start making money in less than 15 minutes (that's what the Author
    Current Status:

    1. The current rail tunnel under the Detroit River is 100 years old and links southwest Detroit and southeast Ontario. It is owned and operated as an ongoing business by the Detroit River Tunnel Partnership (DRTP).

    2. The DRTP consists of Canadian Pacific Railway (CPR) and Borealis Infrastructure Trust, a part of the Ontario Municipal Employees Retirement System (OMERS)

    3. The current rail tunnel carries over 460,000 rail cars per year

    4. The Detroit/Windsor rail tunnel is a vital link between the Port of Montreal, the rest of Canada and the entire U.S. Midwest. Canadian Pacific Railway also uses this rail tunnel to reach into the southern and southwestern United States as well as Mexico.

    5. The existing tunnel although in excellent physical shape finds itself undersized and unable to handle today’s taller rail cars

    6. The existing rail tunnel has been designated as critical infrastructure by Homeland Security

    The Problem:

    1. Container traffic out of the Port of Montreal is expected to double in the next ten years and utilizing more and more double-stacked container cars; automotive companies are shipping vehicles and auto parts in the new, high-capacity Automax rail cars

    2. The existing Detroit/Windsor rail tunnel is not tall enough to allow double-stacked container cars or Automax cars to pass through.

    3. Without a replacement rail tunnel, rail service will have reduced options

    4. The replacement rail tunnel will allow Detroit to become a logistics hub

    5.A replacement rail tunnel will enhance economical rail freight shipping throughout the Midwest and the South.

    The Solution:

    1. The Detroit River Tunnel Partnership (DRTP) would like to build a replacement rail tunnel near the existing rail tunnel

    2. The replacement rail tunnel will bring the following to the Detroit/Windsor region:

    1. Over 1,700 jobs

    2. Over $600 million in investment

    3. It will bring more rail freight to the region

    4. It will help save current and future jobs

    Internal Diameter

    27.5 ft. (8.4 m)

    Tunnel Length

    9,334 ft. (2,845 m)

    Sub-River Length

    2,640 ft. (750 m)

    Maximum Grade

    2.15%

    Lining Thickness

    1.6 ft. (0.5 m)

    River Depth

    49.2 ft. (15 m)

    Minimum Cover – River

    18 ft. (5.5 m)

    Minimum Cover – Land

    13.1 ft. (4 m)

    Operating Speed

    50 mph (80 kph)

    5. Replacement Rail Tunnel Specs

    It will be the first transportation infrastructure in over 75 years at this border crossing

    6. The DRTP has completed engineering to ensure the viability of this project

    7. Some of the support the replacement rail tunnel includes: MDOT, Detroit Renaissance, the Detroit Regional Chamber, Wayne County Executive Robert Ficano, Senator Debbie Stabenow, Teamsters President

    Senior Medical Insurance - Not Just One Choice
    There are several important choices and options to consider when looking for the best coverage and the least expensive senior medical insurance and financial assistance—annuities, health insurance, disability insurance, long term care insurance, and life insurance.Annuities are insurance products that provide income immediately or in the future. The purchaser pays at least one pre
    nd the entire U.S. Midwest. Canadian Pacific Railway also uses this rail tunnel to reach into the southern and southwestern United States as well as Mexico.

    5. The existing tunnel although in excellent physical shape finds itself undersized and unable to handle today’s taller rail cars

    6. The existing rail tunnel has been designated as critical infrastructure by Homeland Security

    The Problem:

    1. Container traffic out of the Port of Montreal is expected to double in the next ten years and utilizing more and more double-stacked container cars; automotive companies are shipping vehicles and auto parts in the new, high-capacity Automax rail cars

    2. The existing Detroit/Windsor rail tunnel is not tall enough to allow double-stacked container cars or Automax cars to pass through.

    3. Without a replacement rail tunnel, rail service will have reduced options

    4. The replacement rail tunnel will allow Detroit to become a logistics hub

    5.A replacement rail tunnel will enhance economical rail freight shipping throughout the Midwest and the South.

    The Solution:

    1. The Detroit River Tunnel Partnership (DRTP) would like to build a replacement rail tunnel near the existing rail tunnel

    2. The replacement rail tunnel will bring the following to the Detroit/Windsor region:

    1. Over 1,700 jobs

    2. Over $600 million in investment

    3. It will bring more rail freight to the region

    4. It will help save current and future jobs

    Internal Diameter

    27.5 ft. (8.4 m)

    Tunnel Length

    9,334 ft. (2,845 m)

    Sub-River Length

    2,640 ft. (750 m)

    Maximum Grade

    2.15%

    Lining Thickness

    1.6 ft. (0.5 m)

    River Depth

    49.2 ft. (15 m)

    Minimum Cover – River

    18 ft. (5.5 m)

    Minimum Cover – Land

    13.1 ft. (4 m)

    Operating Speed

    50 mph (80 kph)

    5. Replacement Rail Tunnel Specs

    It will be the first transportation infrastructure in over 75 years at this border crossing

    6. The DRTP has completed engineering to ensure the viability of this project

    7. Some of the support the replacement rail tunnel includes: MDOT, Detroit Renaissance, the Detroit Regional Chamber, Wayne County Executive Robert Ficano, Senator Debbie Stabenow, Teamsters President

    Hotel Internet Marketing and the Secret of Copywriting
    Are you a Hotel Marketer? Do you want to improve your Hotel Internet Marketing Sale? Here are the suggestion: revise your website copywriting!I’ve seen many websites in our hotel & hospitality industry crowded with copywriting mistakes. These mistakes are rather diverse. Can I list some here? Yes, here they are:# Unattractive word, misspell word.# Wrong grammatical se
    panies are shipping vehicles and auto parts in the new, high-capacity Automax rail cars

    2. The existing Detroit/Windsor rail tunnel is not tall enough to allow double-stacked container cars or Automax cars to pass through.

    3. Without a replacement rail tunnel, rail service will have reduced options

    4. The replacement rail tunnel will allow Detroit to become a logistics hub

    5.A replacement rail tunnel will enhance economical rail freight shipping throughout the Midwest and the South.

    The Solution:

    1. The Detroit River Tunnel Partnership (DRTP) would like to build a replacement rail tunnel near the existing rail tunnel

    2. The replacement rail tunnel will bring the following to the Detroit/Windsor region:

    1. Over 1,700 jobs

    2. Over $600 million in investment

    3. It will bring more rail freight to the region

    4. It will help save current and future jobs

    Internal Diameter

    27.5 ft. (8.4 m)

    Tunnel Length

    9,334 ft. (2,845 m)

    Sub-River Length

    2,640 ft. (750 m)

    Maximum Grade

    2.15%

    Lining Thickness

    1.6 ft. (0.5 m)

    River Depth

    49.2 ft. (15 m)

    Minimum Cover – River

    18 ft. (5.5 m)

    Minimum Cover – Land

    13.1 ft. (4 m)

    Operating Speed

    50 mph (80 kph)

    5. Replacement Rail Tunnel Specs

    It will be the first transportation infrastructure in over 75 years at this border crossing

    6. The DRTP has completed engineering to ensure the viability of this project

    7. Some of the support the replacement rail tunnel includes: MDOT, Detroit Renaissance, the Detroit Regional Chamber, Wayne County Executive Robert Ficano, Senator Debbie Stabenow, Teamsters President

    US Military Loan-Armed Forces Financial Tips
    There are many advantages to be had from being in the US Armed Forces not just the honor and service, but as either a current or retired member of the US Armed Forces or the National Guard you are actually eligible to get a US military loan. So what are the advantages to be had from getting a military loan and where do you go to get one? In this article we will provide a brief
    P) would like to build a replacement rail tunnel near the existing rail tunnel

    2. The replacement rail tunnel will bring the following to the Detroit/Windsor region:

    1. Over 1,700 jobs

    2. Over $600 million in investment

    3. It will bring more rail freight to the region

    4. It will help save current and future jobs

    Internal Diameter

    27.5 ft. (8.4 m)

    Tunnel Length

    9,334 ft. (2,845 m)

    Sub-River Length

    2,640 ft. (750 m)

    Maximum Grade

    2.15%

    Lining Thickness

    1.6 ft. (0.5 m)

    River Depth

    49.2 ft. (15 m)

    Minimum Cover – River

    18 ft. (5.5 m)

    Minimum Cover – Land

    13.1 ft. (4 m)

    Operating Speed

    50 mph (80 kph)

    5. Replacement Rail Tunnel Specs

    It will be the first transportation infrastructure in over 75 years at this border crossing

    6. The DRTP has completed engineering to ensure the viability of this project

    7. Some of the support the replacement rail tunnel includes: MDOT, Detroit Renaissance, the Detroit Regional Chamber, Wayne County Executive Robert Ficano, Senator Debbie Stabenow, Teamsters President

    Mortgage Insurance Explained
    Getting a mortgage is bad enough – what with terms like fixed rate, discount, variable etc – so mention mortgage insurance and naturally your eyes will start to glaze over.However, mortgage insurance is an extremely important insurance to have – in fact, it can the difference between keeping a roof over your head or ending up having your home repossessed.If you recently took
    pth

    49.2 ft. (15 m)

    Minimum Cover – River

    18 ft. (5.5 m)

    Minimum Cover – Land

    13.1 ft. (4 m)

    Operating Speed

    50 mph (80 kph)

    5. Replacement Rail Tunnel Specs

    It will be the first transportation infrastructure in over 75 years at this border crossing

    6. The DRTP has completed engineering to ensure the viability of this project

    7. Some of the support the replacement rail tunnel includes: MDOT, Detroit Renaissance, the Detroit Regional Chamber, Wayne County Executive Robert Ficano, Senator Debbie Stabenow, Teamsters President James P. Hoffa, the UAW and many other government, business and labor leaders

    8. The replacement rail tunnel can be completed in less than four years

    HTTP = HTML link (for blogs, profiles,phorums):
    <a href="http://www.memberyou.net/article/189490/memberyou-Why-We-Need-A-Replacement-Rail-Tunnel-At-The-DetroitWindsor-Crossing.html">Why We Need A Replacement Rail Tunnel At The Detroit-Windsor Crossing</a>

    BB link (for phorums):
    [url=http://www.memberyou.net/article/189490/memberyou-Why-We-Need-A-Replacement-Rail-Tunnel-At-The-DetroitWindsor-Crossing.html]Why We Need A Replacement Rail Tunnel At The Detroit-Windsor Crossing[/url]

    Related Articles:

    The Great Debate

    Is A Bad Credit Home Equity Loan Possible If You Have Damaged Credit?

    Writing Fiction That Sells

    Bookmark it: del.icio.us digg.com reddit.com netvouz.com google.com yahoo.com technorati.com furl.net bloglines.com socialdust.com ma.gnolia.com newsvine.com slashdot.org simpy.com shadows.com blinklist.com