Member You
#1 in Business Subscribe Email Print

You are here: Home > Computers and Technology > Hardware > Colocation Facility Cooling System Considerations

Tags

  • adequate
  • automaticallyregular maintenancecrac
  • important thing
  • front server

  • Links

  • Colorado Home Equity Loans ??“ Finding the Best Home Equity Rates
  • Basic Information about Betta Fish
  • Perfect Shortbread: the Art and Science of Baking
  • Member You - Colocation Facility Cooling System Considerations

    Four Employee Behaviors That Can Kill Your Business
    I found it important to clarify for employees what “deal-breaker” behavior was at my company. These are the things I insisted would not be tolerated and would lead to immediate or ultimate termination, depending on the nature of the infraction of these hard and fast rules. Here are the behaviors I would not tolerate:1. Gossip. Rumors can be incredibly disruptive to a company. A lack of information can get rumors started, and frank explanations can usually stop them. However, some employees thrive on the admiration of
    mportant thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/sq

    Service Release Premium - Why You Should Never Trust Your Bank When Mortgage Refinancing
    If you are considering mortgage refinancing with your Bank you should read this discussion before committing to a Bank loan. Banks charge Service Release Premium with their mortgage loans, a hidden fee that will cost you thousands of dollars in unnecessary interest. Here is what you need to know about Service Release Premium and how Banks overcharge for their mortgage loans.Service Release Premium is the markup Banks add to their mortgage interest rates to make a profit on the secondary market. Banks pool their mor
    Most companies know to find a colocation facility that has good Internet service and Internet provider and carrier options. However, cooling systems are often overlooked. Most servers now are made to operate at normal office conditions, which mean that two environmental factors should be met:
    • The temperature should stay between 72° F and 76° F
    • The humidity should be between 45% and 60%, with 45% ideal
    • Cooling units must be on continuously, so servers will not overheat (this precludes standard HVAC units).

    If the cooling system goes down, it can cause the equipment to overheat, causing the network to go down and even damaging equipment. Colocation facility cooling systems include three areas: the facility layout, chillers, and computer room air conditioning (CRAC) units.

    Facility Layout
    Servers generate heat as they run. This is generally blown out the back of the server by fans; cool air is taken in through vents at the front. Server racks and rows should be laid out to manage hot air coming from the servers and conditioned air going to their intakes by designating “hot rows,” which face the server fans, and “cold rows,” which face the intakes. Designated hot and cold rows keep air circulating in the best directions to keep servers from overheating.

    Facility Design
    There are two kinds of building design for colocation facilities: raised floor and solid floor. Raised floor was the preferred structure when servers were towers because the mesh flooring allowed air conditioned air to blow from the bottom directly across their intakes. However, since servers are stacked in racks, cold air must reach the tops of the racks to cool machines. Solid floor facilities are a better option. The facility should take into account the following:

    • Solid floor designs must have mesh front and rear doors for th server cabinets to allow hot air to escape.
    • For raised floor designs, cold air must have enough air pressure to force air to the top of the server cabinets. Ideally, special duct work will be in place to force the airflow upward.
    • For raised floors, server cabinets should not have vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/squ

    Improve Financial Health Through Bad Credit Debt Consolidation
    People tend to fall in debts in these days of easy availability of finance and liberal use of credit cards and as a consequence are labeled as having bad credit. Primary concern of these people is to eliminate debts as early as possible. An effective and popular way of eliminating previous debts, bad credit debt consolidation makes available required finance at easy terms and conditions to pay off debts. Lenders provide loan for bad credit debt consolidation taking into account different financial backgrounds of borrowers. areas: the facility layout, chillers, and computer room air conditioning (CRAC) units.

    Facility Layout
    Servers generate heat as they run. This is generally blown out the back of the server by fans; cool air is taken in through vents at the front. Server racks and rows should be laid out to manage hot air coming from the servers and conditioned air going to their intakes by designating “hot rows,” which face the server fans, and “cold rows,” which face the intakes. Designated hot and cold rows keep air circulating in the best directions to keep servers from overheating.

    Facility Design
    There are two kinds of building design for colocation facilities: raised floor and solid floor. Raised floor was the preferred structure when servers were towers because the mesh flooring allowed air conditioned air to blow from the bottom directly across their intakes. However, since servers are stacked in racks, cold air must reach the tops of the racks to cool machines. Solid floor facilities are a better option. The facility should take into account the following:

    • Solid floor designs must have mesh front and rear doors for th server cabinets to allow hot air to escape.
    • For raised floor designs, cold air must have enough air pressure to force air to the top of the server cabinets. Ideally, special duct work will be in place to force the airflow upward.
    • For raised floors, server cabinets should not have vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/sq

    Why Contextual Advertising Works, and will Work for Your Website
    As we spend greater lengths of time surfing the internet, we inadvertantly aquire traits and habits that streamline our progress through its pages. One such trait is known as banner blindness, and it's quite possible to attribute the decline in garish, loud advertising schemes, and the recent success of contextual text advertisments to its effects.Recent studies conducted by the Nielsen/Norman Group found that internet users avoided viewing banner advertisments. Text advertising is read more often than display adverti
    oor was the preferred structure when servers were towers because the mesh flooring allowed air conditioned air to blow from the bottom directly across their intakes. However, since servers are stacked in racks, cold air must reach the tops of the racks to cool machines. Solid floor facilities are a better option. The facility should take into account the following:
    • Solid floor designs must have mesh front and rear doors for th server cabinets to allow hot air to escape.
    • For raised floor designs, cold air must have enough air pressure to force air to the top of the server cabinets. Ideally, special duct work will be in place to force the airflow upward.
    • For raised floors, server cabinets should not have vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/sq

    Real Estate Marketing Strategies: 5 Tips to Use Your Sphere of Influence to Double Your Income
    I find that so many of my clients are marketing avoidant when it comes to their sphere of influence. And yet statistics show that your sphere of influence can be the greatest source of referrals. This article show you how to dig in and get the “ gold.”Tip 1: Define and Rate your Sphere of InfluenceWhen is the last time that you took a good look at your sphere of influence? What is the total? What are the categories in that group? Do you have past clients, friends, acquaintances, people you hardly know?
    e vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/sq

    Choosing a Lawyer: Avoiding the Pitfalls and Selecting the Right Lawyer for Your Needs
    Most people who need legal help are not trained legal professionals, and may have little real knowledge of the law. This makes finding the right lawyer much like rolling the dice. You can take your chances and hope for the best, but you may not know the result until it is too late to change your mind.Other lawyers can usually tell if an attorney is sensible and competent, or one step away from disbarment. Unfortunately, investing in a law school education is not a practical way for most people to go about selecting th
    mportant thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be below .025 tons/square foot. This same formula is used for chiller systems, with the same ideal ratios.

    It is important to look for a colocation facility that has Internet provider options and backup power systems. Equally important is a facility with the right design, chillers, and CRAC units to cool the server room. Keeping equipment from overheating will keep networks up and makes equipment last longer. Like Internet connections, network uptime, and power backups, cooling systems signify a quality colocation facility.

    HTTP = HTML link (for blogs, profiles,phorums):
    <a href="http://www.memberyou.net/article/174677/memberyou-Colocation-Facility-Cooling-System-Considerations.html">Colocation Facility Cooling System Considerations</a>

    BB link (for phorums):
    [url=http://www.memberyou.net/article/174677/memberyou-Colocation-Facility-Cooling-System-Considerations.html]Colocation Facility Cooling System Considerations[/url]

    Related Articles:

    Effective Negotiation Skills: A Practical Application

    Presentations? Not Me!

    Ethical MLM, Network Marketing Work From Home Business Opportunity

    Bookmark it: del.icio.us digg.com reddit.com netvouz.com google.com yahoo.com technorati.com furl.net bloglines.com socialdust.com ma.gnolia.com newsvine.com slashdot.org simpy.com shadows.com blinklist.com